New Flooring Needs No Molding

If you leave the base molding in place and install new flooring you must leave a gap in front of your existing base molding.
New flooring needs no molding. It has a protruding edge centered on the bottom that fills the gap between two different floors. Leave a 1 4 inch or larger gap between the existing baseboard and the new hardwood flooring you are installing. Buy trim that is thicker and will cover expansion gap. There needs to be a 1 4 gap next to all walls to allow the flooring room to expand.
Is it necessary to place t molding transitions and expansion breaks in floating floors. Feb 28 2020 explore kermans flooring s board creative flooring transitions between rooms followed by 302 people on pinterest. While they often go unnoticed they are essential both for the elegance and functionality of your floors. No you never need to use quarterround.
I try to do all installs without using it. But either you cover it with base shoe molding or you leave a nice finish cut and caulk it only if the floor is glued down. T molding is a type of threshold that has a slight beveled or rounded top. Yes when directed by the manufacturer t molding transitions and expansion breaks must be used the reasons manufacturers recommend expansion breaks and doorway transitions in floating floors is three fold.
Transition molding is the buffer that helps one surface transition to the other so that there are no abrupt or unfinished edges in your home. Also you should never press down trim on flooring it can be gently set on it. Yes leaving that gap is common. Flooring salesman and installer here.
However your new flooring will raise the level of your floor slightly about 3 8 inch so you need to be mindful of transitions to other rooms. You ve not only shrunk your base molding by covering the bottom part with new flooring but now you ve covered even more with quarter round. See more ideas about flooring creative flooring floor design. That means you don t have to tear out old surfaces before you begin.
This gap is needed to give the hardwood room to move with changing humidity. This gap should be covered with trim of some sort. Your contractor should be using shoe moldings there and around all cabinets. That space now needs to be covered by quarter round molding.
Slice out the bottom 25 5 inch of drywall so that your flooring has the proper expansion gap. The problem with baseboard alone is that most baseboard is 3 8 thick leaving only an 1 8 of an inch for the wood to contract without exposing the edge.