No Hub Floor Cleanout
All that is needed is a no hub coupling to attach the drain to the pipe.
No hub floor cleanout. No hub cast iron cleanout pft524rh at ferguson. The z1400 adjustable floor cleanout with gas and watertight abs tapered thread plug and round scoriated cast iron extra heavy duty secured top comes in cast iron z polished bronze zb nickel bronze zn and stainless steel zs top options that are adjustable to the finished floor. No hub cast iron cleanout body with neoprene gasket. Recommended for unfinished floor areas.
Designed to easily adapt either cast iron or plastic pipe. Grainger s got your back. Neoprene gasket ensures gas tight. Nobody expects more from us than we do.
Usually ships within 5 to 7 days. As previously stated the hub of the pipe is the female bell end of the pipe which leaves the male end of the pipe the no hub end. Neoprene gasket ensures gas tight seal. Zurn co2451 abs st abs adjustable floor cleanout with nickel square top 3 x 4 solvent weld pipe size 5 3 16 diameter 1 0 out of 5 stars 1.
The no hub connection option is probably the most used by nonprofessionals due to the ease of installation. Cast iron no hub body with heavy duty cast iron cover. Only 1 left in stock more on the way. No more leaking or seized cleanout plugs our exclusive gas tight gasketed brass plugs hold for testing and are easily removed and replaced.
Recommended for unfinished floor areas. Looking for zurn cleanouts for use with floor cleanouts 38uk39. This cleanout is compatible with inisde caulk no hub. No hub cast iron cleanout zn1400 2nh at ferguson.
Easy online ordering for the ones who get it done along with 24 7 customer service free technical support more. Smith 4020 series finished floor cleanouts with adjustable tops. Floor drains channels trench watts cleanouts create an access point for piping inspection and maintenance. Drain cleanouts tees access covers doors jay r.
Smith carefully designs and manufactures a full line of drain cleanouts access covers and access doors to meet the needs of any non residential construction project need.